Eastbound Track 2 signal ahs changed from CLEAR to STOP and PROCEED ASPECT red over Red (Steady) re NORAC Rule 291, Name STOP and Proceed INDICATION: Stop, then proceed at Restricted Speed until the entire train ahs cleared all interlocking and spring switches. (if signal is an interlocking of CP signal ) and the leading wheels have; Passed a more favorable signal or Entered non signaled DCS Territory ). The 12:36pm is seen here slowly departing track 2 platform. |
Date:
8/23/2022 |
Location:
Summit, NJ Map ![Show Summit on a rail map](/images/map_us.gif) |
Views:
145 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Steve Coraggio |
|
Author: Steve Coraggio
|
![Aspect STOP and PROCEED](/pictures\145629\DSC_0301(M).JPG) |
Picture Categories: RollingStock,Station,Signal,Track,Action |
This picture is part of album: The 12:36PM Eastbound Train Crosses Over from Track 1 to Track 2 |